{"product_id":"creative-simulation-long-lead-soft-fishing-lure","title":"Soft Lead-Head Lure 12 cm","description":"\u003cp\u003eA 12 cm soft bait moulded onto a lead head, so it sinks with the right posture and swims without extra rigging. Five finishes, including a luminous version for dusk and deeper water.\u003c\/p\u003e\n\u003ch3\u003eSpecifications\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eMaterial: lead head with PVC body\u003c\/li\u003e\n\u003cli\u003eLength: 12 cm\u003c\/li\u003e\n\u003cli\u003eWeight: approximately 8.5 g\u003c\/li\u003e\n\u003cli\u003eFinishes: pink, yellow body with orange back, luminous red head, white, transparent\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eIn the box\u003c\/h3\u003e\n\u003cp\u003e1 x lure\u003c\/p\u003e\n\u003cp\u003eShips tracked worldwide. Delivery times are set out in our \u003ca href=\"\/pages\/shipping-policy\"\u003eshipping policy\u003c\/a\u003e.\u003c\/p\u003e","brand":"Fishers North","offers":[{"title":"Pink","offer_id":54680479924551,"sku":"CJYE138601301AZ","price":8.99,"currency_code":"EUR","in_stock":true},{"title":"Red","offer_id":54680479957319,"sku":"CJYE138601303CX","price":8.99,"currency_code":"EUR","in_stock":true},{"title":"Six-colour set","offer_id":54680479990087,"sku":"CJYE138601306FU","price":11.99,"currency_code":"EUR","in_stock":true},{"title":"Transparent","offer_id":54680480022855,"sku":"CJYE138601305EV","price":8.99,"currency_code":"EUR","in_stock":true},{"title":"White","offer_id":54680480055623,"sku":"CJYE138601304DW","price":8.99,"currency_code":"EUR","in_stock":true},{"title":"Yellow","offer_id":54680480088391,"sku":"CJYE138601302BY","price":8.99,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3066\/9383\/files\/79a1703a-0ec7-4313-ae85-2172ba8b7b2a.jpg?v=1787171517","url":"https:\/\/fishersnorth.com\/products\/creative-simulation-long-lead-soft-fishing-lure","provider":"FishersNorth","version":"1.0","type":"link"}