Home /Lures /Soft Lead-Head Lure 12 cm
Soft Lead-Head Lure 12 cm
€8,99
A 12 cm soft bait moulded onto a lead head, so it sinks with the right posture and swims without extra rigging. Five finishes, including a luminous version for dusk and deeper water.
Specifications
- Material: lead head with PVC body
- Length: 12 cm
- Weight: approximately 8.5 g
- Finishes: pink, yellow body with orange back, luminous red head, white, transparent
In the box
1 x lure
Ships tracked worldwide. Delivery times are set out in our shipping policy.
ShippingFree over €100
DeliveryTracked worldwide, see shipping policy
Returns14-day right of return
Specifications
Brand
Fishers North
Type
Lures
SKU
CJYE138601301AZ
Weight
29 g
Options
6 variants
Availability
In stock
Add a custom.specifications list metafield to control these rows.